Night 0Existing floor · staff at their workstations
Negotiated Mill-Direct pricing on materials to owner.
Services
Flooring programs built around occupied buildings
Each program uses the same lift-and-replace execution model. The difference is how it’s bought, planned, tracked and reported.
National Account Program
For building owners, asset managers and property managers running multi-site portfolios. One contract and one point of contact, with pre-approved materials and Mill-Direct pricing so every site gets the same result and the same standards.
For owners of GSA-leased assets, federal portfolios and institutional real estate. We treat flooring as a managed capital asset rather than a reactive maintenance expense.
What’s included
Multi-year capital planning aligned to lease cycles
Standard installation methodology at every location
Defined phasing and sequencing protocols
Lifecycle tracking by building, asset and product
Consolidated reporting across regions
A single point of national accountability
What it gets you
Predictable budgets
Less variance between properties
Consistent quality standards
Fewer vendors to oversee
Mill Direct Program
Buying direct from the manufacturer can cut material costs, but unmanaged it creates gaps in logistics, delivery timing and installation. We coordinate the purchase and keep full control of execution.
What’s included
Direct manufacturer coordination
Transparent purchasing
Logistics planning and inventory control
Delivery sequenced to occupancy constraints
Compliance-ready documentation and closeout
What it gets you
Clear material pricing
No coordination gap between supply and install
Lower schedule risk
Cyclical Floor & Paint Program
Federal portfolios need recurring upgrades tied to lease renewals, SFO requirements and asset lifecycles. We run flooring and painting as one coordinated sequence so each area is disturbed once.
What’s included
Coordinated flooring and paint crews
Night and off-hour protocols
One project manager across both trades
Scheduling aligned to each asset
Documented quality checks and closeout
What it gets you
Minimal disruption to occupants
No trade overlap or sequencing conflict
Consistent results across the portfolio
Plan your next occupied renovation
Tell us about one building or a whole portfolio. We’ll review scope, occupancy constraints and schedule, and come back with a phasing approach and budget range.
One flooring program for every property you manage
Whether you manage 5 properties or 500, the National Account Program gives you a single contract, a single point of contact and the same standard of work at every location.
Our method is designed for buildings that can’t close. Areas are replaced in small overnight phases with furniture lifted in place, so the work happens around your operations instead of the other way around.
Night 0Existing floor · staff at their workstations
⤧ Drag to spin
1,230+ projects completed nationwide
15M+ sq ft installed and managed
26 years delivering occupied flooring programs
45+ years of leadership experience
What changes when the building can’t close
Replacing carpet in an empty building is a flooring job. Replacing it while an agency or tenant keeps working is a logistics, security and scheduling job that happens to involve flooring. That’s the part we’re built for.
Conventional replacement
Furniture torn down and rebuilt by a separate mover
Electrical and data disconnected and reconnected
Staff relocated or sent home for days
Several trades to schedule and supervise
OFS lift-and-replace
Workstations lifted in place, never dismantled
Power and IT stay live throughout
Work runs nights and off-hours in small phases
Each area is back in service the next business day
Three phases, repeated area by area
01
Controlled preparation
Staff secure personal items in labeled mobile containers the day before
A phasing plan sets the order of every workspace
Assets and locations are tracked
Materials and equipment are staged in advance
02
Lift-and-replace
Workstations and cubicles are lifted, not dismantled
Electrical and IT systems stay live
Flooring is removed and replaced in manageable phases
Painting, if included, runs in the same sequence
03
Verification and return
Quality control inspection of each area
Daily Status Report issued
Space returned fully operational the next business day
What this removes from your project
Furniture teardown and rebuild
A separate moving contractor
Electrical and data disconnection
Uncontrolled overlap between trades
Multi-day shutdowns of whole floors
What it protects
Agency and tenant productivity
Mission continuity
Security-sensitive areas
Live building systems
Long-term asset value
Reporting
Every shift ends with a Daily Status Report. For portfolio clients, reports roll up by building and region, covering square feet completed by location, schedule and milestone status, phase metrics and quality documentation. That gives asset managers what they need to line flooring up with capital plans, lease cycles and SFO requirements.
Daily Status ReportFederal Center, Night 3 of 9
Completed tonight
[4,200] sq ft
Phases complete
[6 of 18]
Areas returned to service
[Floor 3, bays A–F]
Issues
[None]
Sample information captured in the Daily Status Reports.
Common questions
Do employees have to move out while the floors are replaced?
No. Staff pack personal items into labeled containers the day before their area is scheduled. Work happens at night or off-hours, and the area is ready for them the next business day.
What happens to power, data and phones?
They stay connected. Workstations are lifted in place rather than dismantled, so cabling isn’t disconnected and IT doesn’t need to re-patch anything.
Do we need to hire a separate furniture mover?
No. Lifting and resetting furniture is part of our work, so there’s no separate mover to schedule or supervise.
Can painting be done at the same time?
Yes. Through the Cyclical Floor & Paint Program, painting runs inside the same phase sequence so each area is disturbed once.
Can you work in secure federal facilities?
Yes. We plan access, badging and escort requirements with facility security before work begins, and schedule around mission-critical operations.
How will we know what was done each night?
Every shift closes with a Daily Status Report covering square footage completed, phases finished, issues and photos.
Get a process briefing for your building
We’ll walk your facilities and security teams through phasing, access and reporting for your specific site.
We’ve completed more than 1,230 projects and installed over 15 million square feet of flooring in occupied buildings across the country, using the same method in every region.
Nationwide coverage
Certified installers in all 50 states, working to one national method and managed centrally by OFS. Every marker is a completed project site.
Federal and government facilities
Our work spans mission-critical offices, administrative centers and secure federal environments in multiple states. We’ve delivered occupied flooring and interior programs in facilities supporting:
Department of Defense
Department of Transportation
Drug Enforcement Administration
Federal Aviation Administration
Federal Bureau of Investigation
Federal Trade Commission
Immigration and Customs Enforcement
National Oceanic and Atmospheric Administration
GSA lessors and institutional portfolios
We work with owners and asset managers of GSA-leased and federal portfolios on multi-state office portfolios, capital improvements tied to lease renewals, SFO-driven interior requirements and portfolio-wide cyclical replacement.
Commercial portfolios
Property management firms and institutional investors use OFS to run one flooring standard across every building they manage, through the National Account Program.
Let’s look at your portfolio
Tell us about one building or a whole portfolio. We’ll review scope, occupancy constraints and schedule, and come back with a phasing approach and budget range.
OFS is a national flooring program management firm. We plan and execute flooring projects seamlessly in buildings that stay occupied: federal facilities, GSA-leased properties and commercial office portfolios.
How we started
For 26 years, we’ve refined one approach: lift furniture in place, keep systems live, work in small overnight phases and return every area the next business day. It has now been used on more than 1,230 projects and over 15 million square feet.
How we’re organized
Program management is centralized. Installation is carried out by regionally coordinated crews trained to the same national method. That gives clients one point of accountability and consistent results across markets.
Credentials
For contracting officers, primes and procurement teams.
Tell us about one building or a whole portfolio. We’ll review scope, occupancy constraints and schedule, and come back with a phasing approach and budget range.